The EKO DOMINATOR boiler is designed for water central heating installations in an open system, and apart from installing a cooling coil with a BVTS valve, also in a closed one. Quick and easy operation is limited only to filling the tank with dry eco-peas and cleaning the boiler from ash. The advantages of the EKO DOMINATOR boiler include: economic and ecological combustion, high thermal efficiency and automatic operation. In the production process, we focus primarily on the reliability and functionality of the devices, but also pay attention to the external appearance of the boilers. We confirm the high quality with a 5-year warranty.
The EKO Dominator stove with a fuel tank and an automatic feeder is intended for supplying water central heating installations and preparing domestic hot water, mainly for the needs of single-family houses, service establishments, retail outlets, utility rooms, etc.
EKO DOMINATOR IS BUILT OF P265GH BOILER STEEL SHEETS
- heat exchanger 6mm thick,
- cast iron retort feeder,
- electronic controller,
- fan with a shutter,
- the feeder safety unit - only for a closed system (optional extra charge),
- coil - only for a closed system (option only for an extra charge).
Boiler operation in the feeder mode
In the side wall of the "front ash pan" of the EKO Dominator boiler, there is a hole for connecting the automatic feeder. This opening can be located on the left or right wall of the boiler, depending on the need to locate the feeder next to the boiler. It is also possible to produce a boiler with a feeder from the front (opposite to the flue gas outlet).
Dimensions and parameters of the EKO DOMINATOR boiler
EKO DOMINATOR stove - certificates and certificates
Our company's priority is to provide customers with the highest quality solutions. The CO boilers produced by us are always certified and are characterized by the highest technical parameters. BRASTAL central heating boilers have declarations of conformity, confirming compliance with national and European standards, including very strict ecological standards - thus reducing fuel consumption and reducing emissions of harmful substances.
The evidence of high quality are numerous certificates, e.g. of the Institute for Chemical Processing of Coal in Zabrze or the Institute of Power Engineering in Łódź (research laboratory for boilers and heating devices). The scope of obtained thermal and emission parameters of EKO DOMINATOR 17,5 kW and 25 kW boilers meet the requirements of class 5 included in the PN-EN 303-5: 2012 standard.
- EKO DOMINATOR 17,5 kW - certificate of the Institute of Power Engineering in Warsaw ED / 386/18
- EKO DOMINATOR 17,5 kW - certificate of the Institute of Power Engineering in Warsaw No. OS / 814 / CUE / 18
- EKO DOMINATOR 25 kW - certificate of the Institute of Power Engineering in Warsaw ED / 417/18
- EKO DOMINATOR 25 kW - certificate of the Institute of Power Engineering in Warsaw No. OS / 825 / CUE / 18 (page 1)
- EKO DOMINATOR 25 kW - certificate of the Institute of Power Engineering in Warsaw No. OS / 825 / CUE / 18 (page 2)